An accessory dwelling unit is a second, smaller home on a lot that already has a house on it. Backyard cottage, casita, granny flat, garden suite, in law suite: same thing, different regional name. What makes it an ADU rather than a shed with a bed in it is that it has its own kitchen, its own bathroom and its own entrance, and your local government has signed it off as a dwelling.
This has become a much easier thing to do than it was five years ago. Several states now require cities to allow ADUs, and a factory built unit can arrive finished and be craned into place in a day. Here is what they cost, and the handful of questions that will tell you what fits in your yard.
The backyard homes in our listings run $60,000 to $256,470 for the building itself, across 361 to 1,200 square feet. These are the base prices the manufacturers list, as of our last review of this page, so treat them as a starting point and ask for a current quote on anything you shortlist. By size band:
Under 400 sq ft · $60,000 to $114,000 · $166 to $286 a square foot
400 to 599 sq ft · $82,900 to $129,000 · $207 to $294 a square foot
600 to 799 sq ft · $110,150 to $159,000 · $153 to $211 a square foot
800 to 999 sq ft · $175,000 to $181,000 · $186 to $194 a square foot
1,000 sq ft and up · $235,870 to $256,470 · $197 to $214 a square foot
Cost per square foot runs $153 to $294, with the middle of the range around $219. The 600 to 799 band is the best rate at $153 a square foot, and the smallest units are the most expensive per foot, which holds across the categories we list. Those are prices for the home, and the section further down sets out what else goes in the budget.
A factory built home is certified to one of three standards before it leaves the building. Which one it carries decides where it can legally sit, and it matters more than the floor plan.
The federal standard for manufactured homes, with a red certification label on the outside of the home. It covers design, strength, fire resistance, energy efficiency and installation, and it takes the place of state and local building codes for the structure itself.
California is the one state that names a manufactured home in its own definition of an accessory dwelling unit, so there a HUD code home can be your ADU as a matter of state law. Elsewhere it is your city or county that answers, and it is worth asking about HUD code by name rather than about factory built homes in general, because the terms mean different things and a planner will hear the difference. Our page on the HUD code standard covers what the label certifies.
Built in a factory to the same building code a site built house follows, inspected by a third party agency the state approves, then placed on a permanent foundation. A modular home is real property like a stick built house: conventional and construction financing both work, it is assessed as a house, and it holds value with the land. This is usually the smoothest route to a permit, because your planning department is being asked to approve a house built to its own code. Each state runs its own program, and state modular programs explains how the approvals work.
Both of these are classified as vehicles rather than as buildings. A park model is built to ANSI A119.5, the park model recreational vehicle standard, and stays under 400 square feet set up. A tiny home on wheels is certified either as a recreational vehicle to NFPA 1192 or as a park model to ANSI A119.5, depending on its size. Because neither is a building, neither is automatically an ADU, and in most places there is a limit on how long you can live in one.
There is one federal rule here that is genuinely useful to know if you are shopping towable homes. A recreational vehicle keeps its exemption from manufactured home standards only if it is designed for recreational use rather than as someone's primary residence, among other conditions, and a unit certified to the park model standard has to carry a notice in the kitchen saying exactly that. So if you are planning to live in it full time, you are looking for a home built to local building code, a state modular program or the HUD code instead. Our pages on the park model standard and the IRC tiny house appendix set out what each one certifies, and park model versus tiny home on wheels compares them directly.
Your answers come from your own jurisdiction, and they come from six questions. Work through them in this order, because each one narrows what is worth looking at. Your planning department can take the first three, by phone, by email or through their online portal, whichever you prefer, and most of them are used to being asked.
Ask by address rather than by neighborhood, because the answer turns on your specific parcel: its zone district, whether it is served by public water and sewer, whether any of it sits in a floodplain, and whether it carries a historic designation. If you are in a homeowners association, ask them too, since their rules work separately from the city's. A yes here is the green light for everything below it.
If you only ask one of these, make it this one. Name all three: a HUD code manufactured home, a state certified modular home, or only something built on site. The answer tells you which half of the catalog to shop, so you spend your time on the homes your city will actually approve.
Ask for the maximum floor area and height for an ADU on your lot, and for the setbacks. Get it as a number for your address rather than a statewide figure, because where a state sets a minimum your city is often more generous than that minimum. Height is the one people forget, and it is what decides whether a two story model is on the table. Our size bands further down turn the answer into a shortlist.
This one is your building department and your utility rather than the planner, and it is the biggest line in the budget after the home. What you need follows from the certification in question two, which is why the order helps. Ask whether the unit can be served from the main house or needs its own service, and whether your sewer or septic has room for another dwelling. If you are on a well and septic, start this conversation early, because it is the answer most likely to shape the whole project.
Long term renting and short term renting are two different permissions, and the second is usually the harder one to get. If rental income is part of your plan, get this in writing before you buy, and ask whether the rule follows the property or the occupant, since that decides whether it survives a sale.
Ask for the fee schedule. Impact fees, connection fees, capacity charges and school district fees are four separate things, often handled by four different offices, and an exemption from one is not an exemption from the others. A little time here keeps the budget honest.
Write the six answers down before you shop. With them you can shortlist in an afternoon, and send a manufacturer a question specific enough to get a real quote back.
Several states now require cities to allow ADUs, and the states below each publish something useful to read before you make that contact. None of them replaces your own city or county, which is where your actual numbers come from, but they are a good place to start and they tell you what your jurisdiction can and cannot ask of you.
This section is general information rather than legal advice, and it reflects the official sources listed at the foot of this page as of our last review in November 2026. Rules change, which is why each entry sends you to the agency that keeps its own page current, and to your own jurisdiction for the final word.
California. Start with the state ADU Handbook, which is kept current and walks through what cities may and may not require. The state rules apply everywhere in California, so the handbook plus your city covers it.
Washington. The Department of Commerce ADU page sets out the state requirements. These apply in much of the state but not all of it, and they phase in on each jurisdiction's own schedule, so your county or city planning department is the one to confirm what applies at your address today.
Oregon. Oregon leaves the specific numbers to your city, so your city planning department is the authority on size, height and setbacks. The Department of Land Conservation and Development publishes the guidance and model code that cities work from, which is useful background before you ask.
Colorado. The Division of Local Government publishes an overview of the state ADU law, which applies in many Colorado cities and parts of counties. One thing worth knowing if you are drawn to the smallest models: the state protections begin at 500 square feet, so for anything below that, ask your jurisdiction whether it allows them. Denver and Fort Collins, where we are planning a show lot, both publish their own ADU pages, Denver here and Fort Collins here.
Arizona. Both cities and counties have to allow ADUs here, and Arizona counties do something unusual for one of our categories: they allow a park model as an accessory dwelling on larger rural lots. There is a size window that decides whether a given unit qualifies, 320 to 400 square feet of interior area, so it is worth checking a model against that early. If you have rural acreage in Arizona, our park models are the first place to look, and Phoenix publishes a helpful starter guide.
Texas and Georgia. Neither has statewide ADU rules, so your city is the whole answer and the six questions are the whole method. Austin is the one to know about: its HOME amendments count what you would call an ADU as simply another home on a qualifying lot, and parking minimums are gone citywide.
Everywhere else, your city or county planning department is the authority, and the six questions work the same way.
It depends on the job, and the jump from 400 to 700 square feet changes what the building can be.
A guest room or a home office. Under 400 square feet. One room, a bathroom, a kitchenette. The most affordable way to a legal second dwelling, and it fits a lot that will not take anything bigger.
A rental. 400 to 600 square feet, one bedroom with a real kitchen. The sweet spot for a long term tenant, and where question two earns its place, because a rental needs to be a dwelling rather than a vehicle.
Family moving in. 600 to 1,000 square feet, one or two bedrooms. Best cost per square foot in the category, and the size where a separate entrance and a full kitchen start to feel like a home rather than an annex.
Two households, properly. 1,000 square feet and up. Fewer jurisdictions treat this as an accessory building, so it is worth asking question one again at this size.
Look through the backyard homes and ADUs we list to see how the sizes read.
Three builders cover most of this category in our listings, and the choice usually becomes obvious once you have the answer to question two.
Meka Modular has the deepest range in our listings, from under 400 square feet up to 1,200, built to HUD code. They are the one to price if you want a small office and a two bedroom quoted from the same catalog.
Boxabl is built around volume manufacturing and a folding shipping format, which is what puts their Casita at the bottom of the price range in this category. Worth a look if delivery is the hard part of your site.
Craftsman Tiny Homes works at the small end, out of Florida and Georgia, and their Summit sits right at the 400 square foot mark where several of the state size rules start to matter.
The price of the home is the easy part to find. The rest of the project is where a budget either holds or does not, and it is the same for every factory built home from every builder.
As a planning figure, assume the full project lands at roughly double the price of the building, and treat better than that as a pleasant surprise. Our guide on what really matters when comparing home models walks through holding two quotes side by side, and how to evaluate land before you buy covers the site questions.
Read whatever your state publishes, then take the six questions to your planning department and get the answers in writing before you finalize anything. Then browse by what they told you: backyard homes and ADUs is the place to start, manufactured homes covers the HUD code side, modular homes the permanent foundation route, and park models the rural Arizona option above. Or widen out across everything we list, or by market in Seattle, Phoenix, Denver and Fort Collins.
The backyard homes in our listings run $60,000 to $256,470 for the building, about $219 a square foot through the middle of the range.
Add site work, foundation, utility connections, permits and fees on top.
In California, yes, as a matter of state law, because the state names a manufactured home in its definition of an ADU. Everywhere else your city or county decides, so ask about HUD code by name. That one answer tells you which half of the catalog to shop.
Your number comes from your jurisdiction rather than from a state law, which is question three above. Where a state sets a minimum size a city has to allow, your city is often more generous than that minimum, so ask for the figure that applies to your address.
One thing that makes these conversations easier: when someone quotes you a size, ask whether it is a minimum your jurisdiction has to allow or a maximum it can impose. Both exist, sometimes in the same set of rules, and knowing which one you are being told turns a confusing answer into a useful one.
In most states with ADU rules, no. Several of them stop a city from requiring you to live on site as an ongoing condition.
If the plan is to rent both the main house and the ADU, confirm it in writing first.
Often not, which is one of the friendliest changes in recent years. Some states stop a city from requiring any additional parking, and others stop it in a defined list of situations, keyed to things like distance from transit, historic districts, car share nearby or the size of your lot. Ask for the list that applies to you, and if you are converting a garage, ask about that specifically, since some cities want the displaced spaces replaced elsewhere.
That is the question these rules mostly left with your city, and it is question five above. Ask whether the rule follows the property or the occupant, because that decides whether it survives a sale.
The building is the fast part. A factory built unit is weeks in production and lands in a day, while permits and site work set the real schedule. Where approval is administrative rather than discretionary there is no public hearing to wait for. Start the permit conversation while you are still choosing and the two run in parallel.
For most people looking at one, yes, and the math is better than it was three years ago because the approval side got easier rather than the buildings cheaper. The thing that decides it is your lot: whether services can reach the back of it, and whether a truck and a crane can.